- Set-up of Schiller Engineering & Maschinenbau GmbH
- STOM - Introduction of Max Stocker (300mm) up to ISO 6
- Docking station for tray transport trolleys in Max Stocker system (300mm)
- SOV - Introduction Shuttle (300mm) up to ISO 3
- Introduction of purging function in Max Stocker shelving system (300mm)
- STOM - Introduction Max Stocker (300mm) up to ISO 4
- STOR - Radial Stocker Open Cassettes (200mm) up to ISO 3
- STOL - Introduction Linear Stocker (200mm) up to ISO 4
- Introduction Transfer Units System (300mm) up to ISO 4
- LIFT - Introduction Lift (200 / 300mm) up to ISO 3
- Tray transport trolleys for docking stations
- STOR - Radial HA200 Box Stocker (200mm) up to ISO 4
- LHOI - Introduction Linear Hoist (200mm) up to ISO 3
- Acquisition of Schiller by SCIO-Holding
- LHOI - Introduction Linear Hoist (300mm) up to ISO 3
- STOL - Introduction Linear Stocker single deep / double deep shelf (300mm) up to ISO 4
- Expansion of SCIO – MFI and IA (USA) become new sister companies under SCIO-Holding
- FT - Introduction conveyor system (300mm) up to ISO 3
- STOL - Introduction Linear Stocker (200mm) up to ISO 3
- STOL - Introduction Linear Stocker open cassettes (200mm) up to ISO 3
- STOL - Introduction Linear Stocker double deep shelf (200mm) up to ISO 4
- FT - Introduction conveyor system for 6“, 8“ open cassettes and HA200 Boxes up to ISO 3